For what it is worth, the 3 solder points at C6 are not vias per se, they are the location of a connector header for the 60 meter expansion module...If the expansion module is not installed, the connector header is not installed and C6 is installed in it's place...The center hole of these 3 holes is a ground and is not used when C6 is installed...The C6 error seems to be common, I have seen at at least half a dozen times...The result is no 40 meter reception in Part II alignment and testing...
Jerry, wa2dkg
>I know some-one else that also nearly did this and I was struggling to
explain what vias were because they looked like pads (and about the same
size). Luckily they stopped at that point as they were confused.<
_______________________________________________
Elecraft mailing list
Post to:
[hidden email]
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
http://mailman.qth.net/mailman/listinfo/elecraft
Help:
http://mailman.qth.net/subscribers.htmElecraft web page:
http://www.elecraft.com