Installation of Q7 and Q8 HELP!!!!

classic Classic list List threaded Threaded
3 messages Options
Reply | Threaded
Open this post in threaded view
|

Installation of Q7 and Q8 HELP!!!!

DR-10
I followed the PA transistor Q7 and Q8 installation instructions to the letter
and there is NO way I can secure the heat sink cover.  Yes, the nylon
shoulder washer is flush with the hole on the transistors and I made sure it
is centered,  I even measured the screw to make sure I'm using a 1/2".  I did
a search to see if anyone else had a problem with this step but I couldn't
find anything that would give me a hint as to what I'm doing wrong.  I REALLY
want to know how the heck this is going to work when all this stuff is on the
back side and it is higher than the standoff spacers.


PLEASE help me with ANY suggestions
72/73
Ann
_______________________________________________
Elecraft mailing list
Post to: [hidden email]
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
 http://mailman.qth.net/mailman/listinfo/elecraft   

Help: http://mailman.qth.net/subscribers.htm
Elecraft web page: http://www.elecraft.com

Reply | Threaded
Open this post in threaded view
|

Re: Installation of Q7 and Q8 HELP!!!!

Mike S-8
At 10:50 AM 12/19/2004, DR wrote...
>and there is NO way I can secure the heat sink cover.  Yes, the nylon
>shoulder washer is flush with the hole on the transistors and I made sure it
>is centered,  I even measured the screw to make sure I'm using a 1/2".  I did
>a search to see if anyone else had a problem with this step but I couldn't
>find anything that would give me a hint as to what I'm doing wrong.  I REALLY
>want to know how the heck this is going to work when all this stuff is on the
>back side and it is higher than the standoff spacers.

How much higher? You seem to imply that a 1/2" screw isn't long enough? The screw goes through the PC Board (~1/16"), a fiber washer (<1/16), a 1/8 standoff, a shoulder washer (<1/16), the transistor tab (<1/16), insulator and heatsink (~1/16); total ~3/8, leaving plenty of thread.

A "2D" fastener is about 1/4, which should be very close to the fiber washer (<1/16), a 1/8 standoff, shoulder washer (<1/16), the transistor tab (<1/16), and insulator.

_______________________________________________
Elecraft mailing list
Post to: [hidden email]
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
 http://mailman.qth.net/mailman/listinfo/elecraft   

Help: http://mailman.qth.net/subscribers.htm
Elecraft web page: http://www.elecraft.com

Reply | Threaded
Open this post in threaded view
|

RE: Installation of Q7 and Q8 HELP!!!!

Dan Barker
In reply to this post by DR-10
Are you sure the shoulder washers are upside right? The shoulders hold the
tab and the turned-down part goes through the tabs.

Dan / WG4S / K2 #2456

<snip>NO way I can secure the heat sink cover.</snip>

_______________________________________________
Elecraft mailing list
Post to: [hidden email]
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
 http://mailman.qth.net/mailman/listinfo/elecraft   

Help: http://mailman.qth.net/subscribers.htm
Elecraft web page: http://www.elecraft.com