Hello List:
K2 SN: 4761, my fourteenth K2 to build, has passed Part II testing and working great like all K2's. Now on to complete the last Part and install all the accessories that have already been built. Johnny, KD4ORO, the owner, will be operating it by the middle of next week for sure. Only minor glitch was a broken miniature 100mh RFC in the VCC line to the PLL Chip. Strange in that the PLL locked up fine but was jumpy when tuning and then would settle down and be fine when tuning was stopped. Discovered a 0.7 volt drop across the choke and so replaced it with a jumper and it stablized. Was lucky enough to have one in my Elecraft parts supply and replaced it and all is well. Back to the work bench.
73
Jim Younce K4ZM
_______________________________________________
Elecraft mailing list
Post to:
[hidden email]
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
http://mailman.qth.net/mailman/listinfo/elecraft
Help:
http://mailman.qth.net/subscribers.htmElecraft web page:
http://www.elecraft.com