KPA500 #181 confession time

classic Classic list List threaded Threaded
2 messages Options
Reply | Threaded
Open this post in threaded view
|

KPA500 #181 confession time

Peter Dent
It is time for me to fess up and start my ingress of humble pie!!

I received my KPA kit in mid July and put it together but could not get any
HV voltage readout and posted to this refllector with several replies and
thankyou to them.
The project was put on hold while the XYL and I went to VK3 land, Melbourne
Australia,for a week to see the Tutankamen Exhibition there (vry good btw).
When we got back there was an email from Gary @support and we spent a few
weeks going thru 2 more PSU's and all sorts of  measurements from various
points on the unit.

Long story short RTFM and "read the current  up to date one" as I mostly
used the <Preliminary one > and missed the very obvious alteration to the
interlock switch actuator which was lengthened by about 4-5mm (>.25") with
the addition of a nut and a screw plus  additional washers..

I am pleased to report that the KPA is on its way back to ZL and should be
here in about 10 days  or so.

Many thanks to ALL @ Elecraft and on this list for there suggestions and
support and I
must say that Gary AM7MY was very patient with me..

vry73 to all

Peter  ZL1PWD

K3#139
KPA500#181


LL+64 09 4370956
Cell+64  0221041630
______________________________________________________________
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:[hidden email]

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html
Reply | Threaded
Open this post in threaded view
|

Re: KPA500 #181 confession time

Johnny Siu
Gary is a great guy in elecraft. Johnny

Sent from my  iPhone 4

Peter Dent <[hidden email]> 於 2011年10月1日 下午3:45 寫道:

> It is time for me to fess up and start my ingress of humble pie!!
>
> I received my KPA kit in mid July and put it together but could not get any
> HV voltage readout and posted to this refllector with several replies and
> thankyou to them.
> The project was put on hold while the XYL and I went to VK3 land, Melbourne
> Australia,for a week to see the Tutankamen Exhibition there (vry good btw).
> When we got back there was an email from Gary @support and we spent a few
> weeks going thru 2 more PSU's and all sorts of  measurements from various
> points on the unit.
>
> Long story short RTFM and "read the current  up to date one" as I mostly
> used the <Preliminary one > and missed the very obvious alteration to the
> interlock switch actuator which was lengthened by about 4-5mm (>.25") with
> the addition of a nut and a screw plus  additional washers..
>
> I am pleased to report that the KPA is on its way back to ZL and should be
> here in about 10 days  or so.
>
> Many thanks to ALL @ Elecraft and on this list for there suggestions and
> support and I
> must say that Gary AM7MY was very patient with me..
>
> vry73 to all
>
> Peter  ZL1PWD
>
> K3#139
> KPA500#181
>
>
> LL+64 09 4370956
> Cell+64  0221041630
> ______________________________________________________________
> Elecraft mailing list
> Home: http://mailman.qth.net/mailman/listinfo/elecraft
> Help: http://mailman.qth.net/mmfaq.htm
> Post: mailto:[hidden email]
>
> This list hosted by: http://www.qsl.net
> Please help support this email list: http://www.qsl.net/donate.html
______________________________________________________________
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:[hidden email]

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html