KX1 s/n 2512 completed

Posted by Chuck Guenther on
URL: http://elecraft.85.s1.nabble.com/KX1-s-n-2512-completed-tp6221625p6225555.html

Fine business, Barry.

One thing I forgot to mention in my earlier comments on the KX1 construction
was with regard to the battery holder installation described on pp. 55-57
of the KX1 manual.

I used small pieces of duct tape to hold the wires in place on the
bottom side
of the left battery holder.  This preserved my sanity during these
rather awkward
construction steps.  Just make sure the tape does not cross the molded
ridges
at the bottom of the holder.

73,
Chuck Guenther  NI0C




Barry, K8QI, wrote:

"I'm presently building KX1 # 2520 currently in phase 2.    Appreciate the
heads up on the 2 items you mention.    I did read the step with the R32 and
was confused.   But thought when I got to that step, it would be clearer...
Glad your's is up and and working fine.    Hope to join you on the air very
soon."



______________________________________________________________
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:[hidden email]

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html