Gents:
I feel that the rumors are getting off track again..... As I recall (which may not be perfect), but in the very beginning, it was posted that (paraphrasing), "If you place a 50% deposit, you can have a SN in the first 200." There was never any statement that 200 was the size of a production run, though lots of us inferred that. Later, again paraphrasing, the cheerful request for up front cash indicated that "A deposit will get you a low SN." I believe that it was officially stated that the size of production run #1 (and #2) were increased, but no absolute numbers were ever made public (it's their ball). For all we know, production run #1 is 100 radios...or 150, or 200 or maybe 220 or 250. There are no facts on this available to the general public (including me). I don't know/recall when submitted orders for Run #2 started, except that it was before Dayton, 2006. All we have to go on so far are the dates that the orders were placed. So for sure, orders placed at Dayton are run #2. Counts - who knows? Right now, I'll be content knowing that I"m somewhere in run #2 and I sure hope that I'll get my K3 before the December holidays. Having the last two weeks of the year off will give me lots of time to assemble and enjoy. But sooner is better! LOL So I agree (based on my own opinion only) that if the published shipping schedule is adhered to, that probably another 100 radios have to go out before "the week of November 30" ends. 20 a day (M-F) should do the trick. Add in a Saturday or two, and YMMV. de Doug KR2Q _______________________________________________ Elecraft mailing list Post to: [hidden email] You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com |
I think you may be wrong in expecting it before the December
holidays, I am in the first run and figure I might get mine just before that. Ordered May 2nd and paid the deposit, and so far I have heard nothing. After the email arrives, its 5 to 10 business days or something before it ships, then there is the wait while its in transit. That could be 15 business days after I get a mail from Elecraft. That could be Dec 15th for me, if I get the Email this Monday. Must have been something selling 200 (or more) radios in the first 2 or 3 days! I got to wonder what the timeframe is when they will get out of battle mode at Elecraft, first there was the anouncement of the K3 (rush of orders), then some details come out, and the 'thinkers' order a bunch, then the reviews come out, another rush of orders, then maybe the US dollar will fall some more making a full K3 cost about 20 euros or something and another rush.... Brett N2DTS > Right now, I'll be content knowing that I"m somewhere in run #2 and I > sure hope that I'll get my K3 before the December holidays. Having > the last two weeks of the year off will give me lots of time to > assemble and enjoy. But sooner is better! LOL > > So I agree (based on my own opinion only) that if the published > shipping schedule is adhered to, that probably another 100 radios have > to go out before "the week of November 30" ends. 20 a day (M-F) > should do the trick. Add in a Saturday or two, and YMMV. > > de Doug KR2Q > _______________________________________________ > > Elecraft web page: http://www.elecraft.com _______________________________________________ Elecraft mailing list Post to: [hidden email] You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com |
In reply to this post by DOUGLAS ZWIEBEL
On Nov 22, 2007 2:53 AM, DOUGLAS ZWIEBEL <[hidden email]> wrote:
> Gents: > > I feel that the rumors are getting off track again..... > > As I recall (which may not be perfect), but in the very beginning, it > was posted that (paraphrasing), "If you place a 50% deposit, you can > have a SN in the first 200." There was never any statement that 200 > was the size of a production run, though lots of us inferred that. I think the idea that a deposit would get you a serial number in the first 200 is also just speculation. I don't recall seeing *any* statement about actual numbers from Elecraft, either of the size of production runs or number of orders taken. They could have taken fewer, or more than 200 deposits. All I recall is that paying a deposit booked you a place in the queue ahead of those who didn't, which seemed a no-brainer at the time as I imagined that every ham on the planet would want a K3 once they found out about it. -- Julian, G4ILO K2 s/n: 392 K3 s/n: ??? G4ILO's Shack: www.g4ilo.com Zerobeat Ham Forums: www.zerobeat.net/smf _______________________________________________ Elecraft mailing list Post to: [hidden email] You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com
Julian, G4ILO. K2 #392 K3 #222 KX3 #110
* G4ILO's Shack - http://www.g4ilo.com * KComm - http://www.g4ilo.com/kcomm.html * KTune - http://www.g4ilo.com/ktune.html |
>From an annoucement from Wayne
----- Original Message ----- From: "wayne burdick" <[hidden email]> To: "Elecraft Reflector" <[hidden email]> Cc: "QRP-L" <[hidden email]>; <[hidden email]> Sent: Saturday, April 28, 2007 9:23 AM Subject: [Elecraft] Announcing the Elecraft K3 Transceiver: 10/100W, 160-6m,Assembled or Kit Greetings! [snip] As explained on the order form, you can reserve a K3 now for initial shipments in July. A 50% deposit is requested if you'd like to secure one of the first 200 production units (serial numbers 20-220, probably). On 22/11/07 08:50, "Julian G4ILO" <[hidden email]> sent: > On Nov 22, 2007 2:53 AM, DOUGLAS ZWIEBEL <[hidden email]> wrote: >> Gents: >> >> I feel that the rumors are getting off track again..... >> >> As I recall (which may not be perfect), but in the very beginning, it >> was posted that (paraphrasing), "If you place a 50% deposit, you can >> have a SN in the first 200." There was never any statement that 200 >> was the size of a production run, though lots of us inferred that. -- There is a coherent plan in the universe, though I don't know what it is a plan for. - Fred Hoyle _______________________________________________ Elecraft mailing list Post to: [hidden email] You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com |
Sorry if this muddied the water - it doesn't say only 200 in first run, just
we could get one of the first 200 On 22/11/07 08:57, "David Ferrington, M0XDF" <[hidden email]> sent: > From an annoucement from Wayne > > ----- Original Message ----- > From: "wayne burdick" <[hidden email]> > To: "Elecraft Reflector" <[hidden email]> > Cc: "QRP-L" <[hidden email]>; <[hidden email]> > Sent: Saturday, April 28, 2007 9:23 AM > Subject: [Elecraft] Announcing the Elecraft K3 Transceiver: 10/100W, > 160-6m,Assembled or Kit > > Greetings! > [snip] > As explained on the order form, you can reserve a K3 now for initial > shipments in July. A 50% deposit is requested if you'd like to secure > one of the first 200 production units (serial numbers 20-220, probably). > > > On 22/11/07 08:50, "Julian G4ILO" <[hidden email]> sent: > >> On Nov 22, 2007 2:53 AM, DOUGLAS ZWIEBEL <[hidden email]> wrote: >>> Gents: >>> >>> I feel that the rumors are getting off track again..... >>> >>> As I recall (which may not be perfect), but in the very beginning, it >>> was posted that (paraphrasing), "If you place a 50% deposit, you can >>> have a SN in the first 200." There was never any statement that 200 >>> was the size of a production run, though lots of us inferred that. -- Times are bad. Children no longer obey their parents, and everyone is writing a book. -Marcus Tullius Cicero, statesman, orator and writer (106-43 BC) _______________________________________________ Elecraft mailing list Post to: [hidden email] You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com |
In reply to this post by DOUGLAS ZWIEBEL
It had better include the 2-May as well, since I was told I was in first
run. I don't believe I've seen anything saying the last ships for this run take us to and end on, the 30th. In fact, someone has one they ordered on 1-May. >From the status page: " One note - We received such a large surge of orders the first 1-5 days after we announced the K3 that we are still working on building and shipping that group and will be for at least another week or more. " And I can't find Erics last update that said about what shipped in the last 2 weeks. On 22/11/07 02:53, "DOUGLAS ZWIEBEL" <[hidden email]> sent: > So I agree (based on my own opinion only) that if the published > shipping schedule is adhered to, that probably another 100 radios have > to go out before "the week of November 30" ends. 20 a day (M-F) > should do the trick. Add in a Saturday or two, and YMMV. -- One glance at a book and you hear the voice of another person, perhaps someone dead for 1,000 years. To read is to voyage through time. -Carl Sagan, astronomer and writer (1934-1996) _______________________________________________ Elecraft mailing list Post to: [hidden email] You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com |
It is always fun to speculate;
Eric wrote: "If you have not ordered before May 10th, we would appreciate your holding off emailing us for status as much as possible." So this might be the cut off date for the 1st run? He also wrote: "Weeks of Nov 12-16 and Nov 19-23 (Orders with deposits)" As a deposit would get you into the first 200, this would indicate that the first 200 should go out the door this week which seems a little optimistic. Or there were never 200 prepaid. Just my speculations... :) 73 de Björn /SM0MDG _______________________________________________ Elecraft mailing list Post to: [hidden email] You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com |
As I am sure you all know...all the while that the good folks at
Elecraft have been shipping out these first 100 K3s, their manufacturing operation (in house and outside assemblers) have been cranking out boards and modules and filters, etc. It is decidedly NOT a serial operation until the testing/packing phase arrives. The net result is that they likely have a large pile of boards now in house being tested and packed for shipping......they have already told us they are hiring staff to test and perform the other necessary functions in order to satisfy our K3-lust. While I have greatly lowered my expectations of when my K3 is likely to arrive, I am confident that the pace of deliveries will significantly increase over the next few weeks. Meanwhile...I am sure enjoying the assembly pictures being provided...thanks to all who have done so. The vicarious experience is better than nothing right now! My wife thinks the whole lot of us are just a bit off kilter...........could she be right? Enjoy and Happy Thanksgiving Day to all John, N6AX K3 # ? Björn Mohr wrote: >It is always fun to speculate; > >Eric wrote: "If you have not ordered before May 10th, we would appreciate >your holding off emailing us for status as much as possible." > >So this might be the cut off date for the 1st run? > >He also wrote: "Weeks of Nov 12-16 and Nov 19-23 (Orders with deposits)" > >As a deposit would get you into the first 200, this would indicate that the >first 200 should go out the door this week which seems a little optimistic. >Or there were never 200 prepaid. > >Just my speculations... :) > >73 de Björn /SM0MDG > > > >_______________________________________________ >Elecraft mailing list >Post to: [hidden email] >You must be a subscriber to post to the list. >Subscriber Info (Addr. Change, sub, unsub etc.): > http://mailman.qth.net/mailman/listinfo/elecraft > >Help: http://mailman.qth.net/subscribers.htm >Elecraft web page: http://www.elecraft.com > > > > Elecraft mailing list Post to: [hidden email] You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com |
Free forum by Nabble | Edit this page |